• Welcome to Asarab !
  • 123th Demo Street,
    Cuba, North America
    +1.208.567.1234
    Mon-Fri, 8am - 8pm
    Info@yoursite.com
    Drop us a line anytime!
Close

Updating of balance sheet in watershed of Dasht-E Kavir

Client: Khorasan Razavi Regional Water Company

Start date: July, 2012

Completion date: January, 2014

Narrative description of Project:

Iran Water Resources Management Company has set forth a development plan entitled “Designing a Water Resources Measurement Network”. According to its prerequisite studies, Regional Water Company of Khorasan Razavi Province has put the study of water balance sheet update project in its priorities, the study area is situated in central desert watershed of Khorasan Razavi, North and South Khorasan, Semnan, Isfahan, Yazd and Tehran. The contract entitled “Updating of balance sheet in watershed of Dasht-E Kavir “, was concluded in 2012 between Khorasan Razavi Regional Water Company and Asarab Consulting Engineers Co. Dasht-e- Kavir basin with an area of 523,226 km2 is the largest water basin of second grade in the country located in the central plateau of Iran. The basin consists of 50 study areas.

Technical details of Project:

Reports of this project are summarized in the following titles:

  • Preparation and compilation of meteorological reports and preparation of temperature, precipitation and evaporation maps
  • Map preparation and report compilation of surface and groundwater status
  • Map preparation and report compilation of surface and groundwater resources quality
  • Preparation of hydroclimate balance sheet by plains and heights of study areas
  • Balance sheet preparation of groundwater for alluvial aquifers
  • Preparation of total water inventory for each study area

 

 

 

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *